Program control for plant capital and OT projects
BlueYoke takes a project from idea to verified savings: charter, schedule, budget, contractors, gates, RAID and benefits in one place. Teams get a plan that's easier to run than MS Project. Executives get one view of what's on track, what's slipping and what it's worth.
Built in MS Project and owned by one person
Every date change goes through the one person who knows the file, and the plant's shutdown calendar lives somewhere else.
Spent, committed and forecast are in three spreadsheets
Finance sees POs, the PM sees tasks, and nobody sees the estimate at completion until month-end.
Status is a slide rebuilt every Friday
Leadership asks "are we on track?" and "what did we save?", and the answer depends on who updated which spreadsheet, and when.
One tool from idea to handover
Stage-gate capital projects, Lean Six Sigma improvements and agile software work run side by side, on the same people, budgets and calendar.
Recorded in the BlueYoke demo workspace. Sample data.
From the idea on the floor to savings on the books
The improvement pipeline sits in the same tool as the projects it feeds, so nothing is retyped between the suggestion box, the capital plan and the control plan.
- Ideas from anyone. A shareable form that needs no login, plus voting, weighted scoring and an impact-vs-effort chart. One click turns an accepted idea into a project with a draft charter.
- Strategy and capital plan. Breakthrough and annual objectives with KPIs, an X-matrix, and funding scenarios by fiscal year and program.
- DMAIC tools on every project. SIPOC, fishbone, FMEA, A3, control plan and lessons learned, with printable PDFs. Build your own tools in Setup.
- Handoff and sustain. Hand a finished project to a process owner and keep tracking the metrics for as long as you choose.
| Metric | Current | Status |
|---|---|---|
| Line 3 OEE | 73% | Holding |
| Changeover, min | 34 | Slipping |
| Scrap, lbs/wk | 1,380 | Holding |
| Realized savings, YTD | $412k |
Sample data
Scheduled around the line, not the calendar
General-purpose PM tools don't know when the line comes down. BlueYoke does.
- Shutdown windows per plant. Cutover tasks are flagged when they drift outside a planned outage.
- Stage gates that mean something. Concept → Approval → Design → Build → FAT/SAT → Commission → Handover, with gate requirements and sign-offs.
- RAID log on every project. Track risks, actions, issues and decisions where the schedule is. An FMEA action can become a RAID item in one click.
- Your fields and templates. Add fields like AFE number, discipline, cost center or MOC required, and save a project as a template so the next one starts complete.
- Bring your existing plans. Import from MS Project (XML), Excel or CSV, and export back out when you need to.
Budgets and forecasts that match the schedule
Costs, commitments and labor are tied to the same projects and tasks the team updates every day, so the forecast moves when the work moves.
- CapEx and OpEx tracked separately, with actuals and open POs per line item.
- Earned value (CPI, SPI and estimate at completion) without building it in Excel.
- Role-based access. Finance and executives see the dollars. Contractors and team members see their tasks.
| Project | Budget | Forecast | Var. |
|---|---|---|---|
| Line 3 case packer | $1.33M | $1.39M | −$60k |
| MES rollout, ph. 1 | $570k | $548k | +$22k |
| Historian & edge | $300k | $372k | −$72k |
| Program total | $2.20M | $2.31M | −$110k |
Sample data
MES and data teams work in sprints. The board is there too.
Software and analytics work is planned in sprints with points and capacity. It still rolls up to the same program dates and budget leadership sees.
To do 3
IT/OT
IT/OT
In progress 2/4
13 pts
13 pts
Review 1/3
Validation
Type it once. BlueYoke fills in the rest.
Most updates take a line of text or a single click, not a form.
- Quick-add. Type FAT punch list @Dave fri #Sprint3 5pts and get a task with the owner, due date, sprint and points already set.
- @mentions and #references. Mention a teammate in any note or comment to notify them. Link a task, RAID item, idea or document with #, and it shows where it's been referenced.
- Ctrl+K to go anywhere. Jump to any project, task, person or document, or run an action, without leaving the keyboard.
- Click to edit. Change an owner, due date, status or points right on the board or in the table. Bulk edit, and paste straight from Excel.
- Works on the floor. The same app runs on a laptop, an iPad or a phone.
Recorded in the BlueYoke demo workspace. Sample data.
For the people who run capital, digital and improvement programs
Program & project managers
One schedule, one budget and one RAID log per project, and no weekly status deck to rebuild.
Plant & operations leaders
See which projects touch your lines and when, before the outage plan is locked.
CI & Lean Six Sigma leaders
Ideas, DMAIC tools and benefit tracking tied to the real project, so savings are measured, not estimated.
Finance & controllers
CapEx and OpEx, commitments, forecast at completion and realized savings, without chasing PMs for numbers.
Engineers & integrators
Your tasks, your timesheet and your board. Contractors only see what they're assigned.
Up and running the same week
Import what you have
Bring in MS Project XML, Excel or CSV schedules, enter projects already underway, or start from a template.
Set up your plants
Add plants, shutdown windows, labor categories and the fields your team already tracks.
Invite the team
Give each person a role per project, from PM and contributor to finance, executive, process owner or viewer.
See your program in BlueYoke
We're onboarding a small group of manufacturing teams. Tell us about your program, or open the demo workspace and try it yourself.